Axiom Structures assisted with the Temporary Works design and structural sequencing works on this deep basement project that recently featured on Channel 4’s Grand Designs program ( http://www.channel4.com/programmes/grand-designs/on-demand/65183-007) The complex temporary works involved suspending the keeper’s lodge in mid-air to allow for the safe formation of the basement structure beneath.
Transforming a historic Chelsea landmark into a luxury boutique hotel
Commercial development combining new-build structures with the sensitive refurbishment
Site visit to inspect the installation of the West Wing frame
Temporary façade steelwork and demolition of the internal structure complete