Axiom Structures was involved in the development of new residential apartments and retail building. The structure consists of a steel podium deck supporting a new lightweight metsec frame system.
Next step is the installation of the concrete podium deck before the metal framing system arrives.
Transforming a historic Chelsea landmark into a luxury boutique hotel
Commercial development combining new-build structures with the sensitive refurbishment
Site visit to inspect the installation of the West Wing frame
Temporary façade steelwork and demolition of the internal structure complete